Denver, CO
Rank #19 of the markets in the index · 1 candidate counties · WECC_SW interconnection region.
Composite siting suitability
50.3/100
Viable
Best submarket: Adams County · typical energize time ~3-5 yrs
| Factor | Score (higher = better) | Value |
|---|---|---|
| Power availability | 60.0 | |
| Water headroom | 29.4 | |
| Hazard safety | 64.0 |
Get the county-level breakdown for Denver, CO
This page shows the market-level score. The full report scores each of the 1 counties individually — per-county power, water, and hazard, the specific hazards in play, and which submarkets are established vs. emerging.
Monitor Denver, CO
Markets shift as power queues, drought, and hazard data change. Get an email when Denver, CO’s siting suitability drops into a worse grade.