Nemo · Water Risk Index

The State of Data-Center Water Risk

An independent ranking of the major U.S. data-center markets on the three factors that now decide a build — water, power, and natural-hazard risk. Built from authoritative public data and updated automatically.
Data current as of September 1, 2026.

Get the Monitor →  ·  Download PDF  ·  Raw data (JSON)  ·  Explore the full index

Key findings

National ranking

Suitability is a 0–100 composite (higher is better), weighting power 40%, water 35%, and hazard 25%.

#MarketSuitabilityGrade WaterPowerHazard
1 Quincy, WA 70.5 Strong 70.4 66.0 78.0
2 Mount Pleasant, WI 70.2 Strong 82.9 58.0 72.0
3 Omaha, NE 67.2 Strong 73.6 66.0 60.0
4 Nashville, TN 65.0 Strong 72.0 64.0 57.0
5 Des Moines, IA 64.9 Viable 72.0 58.0 66.0
6 Columbus, OH 63.9 Viable 81.0 42.0 75.0
7 Council Bluffs, IA 63.5 Viable 72.4 58.0 60.0
8 Hillsboro, OR 63.3 Viable 60.9 66.0 62.5
9 Umatilla, OR 62.8 Viable 54.0 66.0 70.0
10 Chicago, IL 61.0 Viable 85.0 42.0 58.0
11 Dallas–Fort Worth, TX 59.5 Viable 42.7 78.0 53.3
12 Austin, TX 59.2 Viable 40.6 78.0 55.0
13 Memphis, TN 58.5 Viable 56.9 64.0 52.0
14 San Antonio, TX 58.0 Viable 36.6 78.0 56.0
15 Richland Parish, LA 57.5 Viable 62.4 58.0 50.0
16 Atlanta, GA 56.2 Viable 45.9 62.0 61.5
17 Abilene, TX 54.3 Viable 26.7 78.0 55.0
18 Northern Virginia (Ashburn) 53.2 Viable 52.1 42.0 72.5
19 Denver, CO 50.3 Viable 29.4 60.0 64.0
20 Reno, NV 47.4 Marginal 26.4 60.0 56.5
21 Los Lunas, NM 47.0 Marginal 18.7 60.0 66.0
22 Phoenix, AZ 46.4 Marginal 22.9 60.0 57.5
23 Las Vegas, NV 45.4 Marginal 19.7 60.0 58.0
24 Salt Lake City, UT 45.2 Marginal 20.0 60.0 57.0
25 Santa Clara, CA 42.5 Marginal 38.0 48.0 40.0

The water story

Isolating water headroom — a market's capacity to supply a large new cooling load without straining its basin — sharpens the concern. The markets absorbing the most growth are, in several cases, the ones with the least room.

Most water headroomScore Least water headroomScore
Chicago, IL85.0 Los Lunas, NM18.7
Mount Pleasant, WI82.9 Las Vegas, NV19.7
Columbus, OH81.0 Salt Lake City, UT20.0
Omaha, NE73.6 Phoenix, AZ22.9
Council Bluffs, IA72.4 Reno, NV26.4

Methodology

Nemo's suitability score is a transparent composite of three 0–100 favorability legs. Power availability reflects ISO/RTO interconnection-queue backlog and time-to-energize (LBNL & ISO annual data). Water headroom is a structural basin-capacity baseline discounted by the current U.S. Drought Monitor reading, refreshed live. Hazard safety is Nemo's physical-hazard model; FEMA's National Risk Index rating is shown as authoritative context in the detailed reports but is not used to compute the hazard leg (its composite is expected-annual-loss weighted and scales with population, unsuited to siting a single asset). Scores are relative rankings across candidate markets for shortlisting; confirm with site-specific utility and water-rights diligence. This product uses FEMA's National Risk Index but is not endorsed by FEMA.

The Water Risk Monitor

We publish this index for free and refresh it as conditions change. Get the monthly Monitor — the updated ranking, the biggest moves, and what they mean for siting.

No spam. The index, updated. Unsubscribe anytime.

Request a free independent read

Weighing a specific site or market? We’ll run an independent water + power + hazard read on it — the same scorecard behind this index — and send it back to you. No cost; we’re taking a limited number in exchange for feedback.